File:Fitzwilliam Street Lower.png
Georgian houses in Fitzwilliam Street Lower, Dublin, were demolished in 1965 to construct offices for the state electricity provider. The street is pictured here in 2016. Source: The development of Irish building conservation in IHBC's Context 163 (Page 12), published by The Institute of Historic Building Conservation in March 2020., written by Arthur Parkinson, assistant professor in planning and urban design at the school of architecture, planning and environmental policy, University College Dublin. https://ihbconline.co.uk/context/163/14/
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 07:39, 17 May 2020 | 1,092 × 688 (1.12 MB) | Designing Buildings (Talk | contribs) | (Georgian houses in Fitzwilliam Street Lower, Dublin, were demolished in !&$% to construct offices for the state electricity provider. The street is pictured here in 2016. Source: ‘The development of Irish building conservation’ in IHBC's Context 163 () |
- Edit this file using an external application (See the setup instructions for more information)
File usage
The following page links to this file:
Featured articles and news
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.